AMEENJI.BO · BSE
AMEENJI RUBBER LIMITED
₹226
-3.83% (-₹9)
Prev. close
₹235
Volume
5,400
As of
26 Nov 2026
Price history
Analyst sentiment
No analyst stances in this range
0 analyst stances · last 90 days · one per analyst
Try a wider range — no analyst has covered this yet.
Explore by date range →Analyst opinions
Fundamentals
About AMEENJI RUBBER LIMITED
Ameenji Rubber Limited engages in the manufacturing, supplying, and exporting rubber products in India and internationally. It offers elastomeric bridge bearings, POT, and spherical bridge bearings; slab seal, strip seal, modular, finger expansion, and compression seal expansion joints; natural, EPDM, nitrile, and silicone rubber sheets, as well as chloroprene (neoprene) sheets; composite grooved rubber sole plates; UIC rubber vestibules; rubberized railway crossing pads, moulded and long-length rubber sheets. The company also retails cow mats, chicken cleaning rubber fingers, rubber gym tiles and rolls, anti-vibration pads, custom extruded profiles, and electric rubber mats. Its products are used in railway coaches, sleepers, railway crossings, bridges, flyovers, roads, highways, and various commercial applications. The company also exports its products. Ameenji Rubber Private Limited was founded in 1997 and is based in Secunderabad, India.
Details
Sector
Industrials
Industry
Railroads
CEO
Mr. Mufaddal Najmuddin Deesawala
Headquarters
Secunderabad
Employees
56
Website
ameenji.comExchange
View on BSE ↗Key stats
Market cap
₹266.32 Cr
P/E ratio (TTM)
42.0
Dividend yield
0.00%
EPS (TTM)
₹5.62
Beta (1Y · daily vs NIFTY 50)
0.17
Shares float
24.20 L
Financial Performance
01 · Financials
02 · Earnings Per Share (EPS)
04 · Operating Efficiency (Growth Rates)
Balance-sheet-based · pre-FY23 not filed in verifiable form
05 · Capital Structure & Asset Utilization
Pre-FY23 not filed in verifiable form
Asset turnover needs a prior year of assets — omitted for the earliest available year.
06 · Asset Base Composition
Pre-FY23 not filed in verifiable form
07 · Debt Level & Coverage
Pre-FY23 not filed in verifiable form
08 · Profit & Loss — as filed
Annual
| Line item | FY25 | FY26 |
|---|---|---|
| ₹94.43 Cr | ₹123.94 Cr | |
| ₹83.74 Cr | ₹115.02 Cr | |
III Profit before exceptional items and tax (I-II) | ₹10.69 Cr | ₹8.91 Cr |
V PROFIT BEFORE TAX (III - IV) | ₹10.69 Cr | ₹8.91 Cr |
| ₹3.01 Cr | ₹2.57 Cr | |
VII PROFIT FOR THE YEAR (V - VI) | ₹7.68 Cr | ₹6.34 Cr |
Basic & Diluted | 9.28 | 5.62 |
Nominal Value per Share | 10.00 | 10.00 |
The company’s own captions, order and figures from its annual reports. A dash means the company printed no figure on that line that year. Each year is read from the latest annual report that carries it and was checked against the headline total shown elsewhere on this page.
All years: consolidated statements.
09 · Balance Sheet — as filed
Annual
| Line item | FY25 | FY26 |
|---|---|---|
(a) Share Capital | ₹8.28 Cr | ₹11.28 Cr |
(b) Reserves and Surplus | ₹13.57 Cr | ₹43.39 Cr |
Minoroty Interest | ₹18,000 | ₹21,000 |
(a) Long Term Borrowings | ₹26.16 Cr | ₹24.73 Cr |
(b) Deferred Tax liabilities (net) | — | ₹5.98 L |
(c) Long Term Provisions | ₹28.46 L | ₹32.01 L |
| ₹102.83 Cr | ₹144.76 Cr | |
(i) Tangible Assets | ₹27.61 Cr | ₹49.20 Cr |
(ii) Capital Work-in-progress | ₹2.11 Cr | ₹5.01 Cr |
(b) Deferred Tax Assets (net) | ₹4.38 L | — |
(c) Long Term Loans and Advances | ₹4.57 Cr | ₹2.00 Cr |
(d) Other Non-Current Assets | ₹3.70 Cr | ₹3.25 Cr |
| ₹102.83 Cr | ₹144.76 Cr |
The company’s own captions, order and figures from its annual reports. A dash means the company printed no figure on that line that year. Each year is read from the latest annual report that carries it and was checked against the headline total shown elsewhere on this page.
All years: consolidated statements.
10 · Cash Flow Statement — as filed
Annual
| Line item | FY25 | FY26 |
|---|---|---|
| ₹2.83 L | ₹5.33 Cr | |
| ₹8.11 Cr | ₹1.64 Cr | |
| ₹-14.21 Cr | ₹-25.75 Cr | |
| ₹6.13 Cr | ₹29.44 Cr | |
Cash equivalents at the beginning of the year | ₹11.85 L | ₹14.68 L |
Cash equivalents at the end of the year | ₹14.68 L | ₹5.47 Cr |
The company’s own captions, order and figures from its annual reports. A dash means the company printed no figure on that line that year. Each year is read from the latest annual report that carries it and was checked against the headline total shown elsewhere on this page.
All years: consolidated statements.
12 · Peer Comparison
Industrials
| Company | ||||||||
|---|---|---|---|---|---|---|---|---|
| Larsen & Toubro Limited | ₹5.72 L Cr | ₹4,132.1 | 32.0 | 5.23 | 14.7% | 1.15 | +11.8% | +1.7% |
| Adani Ports and Special Economic Zone Limited | ₹4.44 L Cr | ₹1,911.3 | 32.1 | 4.62 | 13.3% | 0.66 | +27.1% | +26.9% |
| Hindustan Aeronautics Limited | ₹3.30 L Cr | ₹4,909.6 | 34.4 | 8.04 | 22.2% | 0.00 | +5.6% | +8.7% |
| Bharat Electronics Limited | ₹2.96 L Cr | ₹404.5 | 46.2 | 12.32 | 25.3% | 0.00 | +15.9% | -2.6% |
| InterGlobe Aviation Limited | ₹2.21 L Cr | ₹5,625 | — | 31.73 | -34.3% | 11.15 | +6.6% | -4.9% |
| ABB India Limited | ₹1.49 L Cr | ₹6,960.5 | 93.9 | 19.01 | 21.3% | 0.01 | +8.1% | +33.9% |
| Bharat Heavy Electricals Limited | ₹1.44 L Cr | ₹418.95 | 50.0 | 5.51 | 6.1% | 0.31 | +18.3% | +44.6% |
| Hitachi Energy India Limited | ₹1.33 L Cr | ₹30,335 | 110.2 | 25.64 | 19.1% | 0.02 | +27.2% | +36.6% |
| Siemens Limited | ₹1.28 L Cr | ₹3,576.6 | 86.6 | 9.64 | 15.9% | 0.01 | +16.2% | +7.8% |
| CG Power and Industrial Solutions Limited | ₹1.23 L Cr | ₹782 | 89.3 | 15.40 | 15.1% | 0.01 | +25.1% | +13.6% |
| Cummins India Limited | ₹1.13 L Cr | ₹4,100.9 | 50.1 | 13.30 | 27.9% | 0.00 | +16.9% | -7.0% |
| AMEENJI RUBBER LIMITED | ₹266.32 Cr | ₹235 | 42.0 | 4.87 | 11.6% | 1.00 | +31.0% | +55.7% |
Ranked by market cap within Industrials, same metrics as the Fundamentals screener. Click a column to sort.
Ameenji Rubber jumps on securing two orders worth Rs 27.31 crore
Ameenji Rubber's stock rose after the company secured two new orders totaling approximately Rs 27.31 crore. These orders are for the manufacture and supply of CGRSP, with one from North Western Railway and another from North East Frontier Railway. The larger order is to be completed within 24 months, and the smaller one within 3 months.